Full-Hydraulic Core Drilling Rig Solution for Deep-Hole Core Drilling
Mar 23, 2026
Aiming at the core requirements of high core recovery rate and accurate geological information in geological sampling, a solution centered on full-hydraulic core drilling rigs can systematically solve the difficulties of sampling and low efficiency in complex formations. The following is a detailed scheme based on industry-leading equipment and typical engineering practices.

Solution Overview
This solution is applicable to scenarios requiring high-quality core samples, such as detailed mineral exploration, geological research, and engineering geological investigation. It demonstrates distinct advantages especially in complex formations like hard rock and fractured zones.
|
Scheme Module |
Details & Technical Key Points |
Problems Solved & Advantages |
|
1. Equipment Selection |
Adopt full-hydraulic crawler core drilling rig (e.g., XDX-6). Key parameters: – Drilling depth: Up to 2000 m with BQ drill rods – Power head torque: 1978–865 Nm (low gear) – Hoisting force: 240 kN |
Crawler chassis enables relocation in complex terrains such as mountains and hills. Full-hydraulic drive realizes stepless speed regulation and precise feed pressure control. |
|
2. Core Drilling Technology |
Wireline coring technology:
2. Equipped with an auxiliary winch (rope speed up to 130 m/min) for wireline fishing. |
1. Reduce tripping frequency: Tripping in deep holes takes hours; wireline coring saves massive auxiliary time, improving overall efficiency by over 30%. 2. Protect core integrity: Minimize core disturbance during tripping, achieving a core recovery rate above 95%. |
|
3. Operating Procedure |
① Rig positioning: Self-propelled to the hole site, leveled with hydraulic outriggers, adjust drilling angle (0–90°). ② Pilot drilling: Use conventional single-tube tool for pilot hole and install casing. ③ Wireline coring: Switch to wireline coring tools, set constant-pressure parameters (adjust WOB and RPM based on lithology), drill continuously to the end of a run. ④ Core recovery: Lower fishing tool via winch, catch and hoist the core barrel, take out cores, number and box them. ⑤ Repeat ③–④ until reaching the final depth of 2000 m. ⑥ Hole completion: Optional geophysical logging, grouting and sealing. |
Constant-pressure drilling system supports automatic/manual bit pressure setting, boosting efficiency and extending bit life. Dynamic parameter display for real-time monitoring of rotation speed, oil temperature, pump pressure, drilling depth, etc. |
|
4. Quality Control |
– Drill rod configuration: Select proper drill rod series according to depth; BQ (φ56) drill rods for 2000 m. – Core handling: Place cores in core boxes in sequence, mark hole number, run, depth, and take photos for records. |
Ensure core quality meets requirements for geological logging and laboratory testing. |
Core Advantages
High coring efficiency: Wireline coring shortens single coring time to 1/3 of conventional methods, greatly reducing auxiliary time in deep-hole drilling.
High core recovery rate: Full-hydraulic system provides stable feed and speed control, minimizing mechanical damage; core recovery rate stably exceeds 95%.
Strong terrain adaptability: Crawler chassis can travel on slopes ≤30°, suitable for roadless mountain exploration areas.
Multi‑functionality: Besides coring, also applicable to water wells, engineering geological investigation, micro-pile holes, etc.

Comparison with Other Drilling Solutions
To clarify the positioning of this solution, it has obvious application differences from several drilling rigs you previously considered:
|
Solution Type |
Core Purpose |
Sampling Method |
Applicable Scenarios |
|
Full-hydraulic core drilling rig (This solution) |
Deep geological coring |
Core (intact column) |
Mineral detailed survey, geological research, deep prospecting |
|
Crawler RC drilling rig |
Rapid geochemical sampling |
Cuttings |
Regional reconnaissance, grade control |
|
Crawler DTH drilling rig |
Blasthole drilling |
No sampling |
Open‑pit mining |
|
Portable pneumatic DTH drilling rig |
Bolt hole construction |
No sampling |
Slope stabilization |
Summary & Recommendations
This solution, combining full‑hydraulic core drilling rig + wireline coring technology, is a mature choice for high‑quality coring in deep holes over 1500 meters. Key points for implementation:
Drill rod configuration: BQ (φ56) series is recommended to ensure drilling capacity at 2000 m.
Drilling fluid design: Optimize fluid properties according to formation lithology (e.g., fractured zones, water‑sensitive formations).
Operator training: Wireline coring requires relatively high operating proficiency.
< Previous: Solution for Crawler-Type Jet Grouting Drilling Rig in Foundation Pit Support and Reinforcement Engi
< Next: None
Get A Quote?
If you are interested in any of our products or would like to make your customized order, please feel free to contact us. We are looking forward to establish successful business relations with you.
Quick Links
Quick Links
Overssale Business
Overssale Business
Tel: +86 714 3860 269
Phone: +86 189 8659 6914
WhatsApp: +86 189 8659 6914
WeChat: +86 189 8659 6914
Email: sales@xingdamachinery.com
ADD: No 7and 8 Factory, #9 Bingang Road, Ezhou, Hubei Province, China
Get The Latest News
Get The Latest News